Theon Life Sciences modern pharmaceutical office reception with double-height ceiling and contemporary lounge seating in DeraBassi, Chandigarh

Theon Life Sciences Corporate Office

Theon Life Sciences Pvt. Ltd.

Overview

A state-of-the-art pharmaceutical corporate office designed to reflect Theon Life Sciences' commitment to innovation and excellence. The project features a stunning double-height reception, premium boardroom facilities, collaborative meeting spaces, and ergonomic workstations—all designed to enhance productivity while maintaining a professional, hygienic environment suitable for a life sciences company.

Project Specs

Client
Theon Life Sciences Pvt. Ltd.
Project Type
Pharmaceutical Office
Location
DeraBassi, Chandigarh
Year
2025

Project Scope

  • Complete interior design and space planning
  • Reception and lounge area design
  • Executive boardroom with AV integration
  • Open-plan workstation layout
  • Meeting room cluster design
  • MEP coordination and execution

Special Features

  • Double-height reception with custom lighting
  • Acoustic-optimized boardroom
  • Biophilic design elements
  • Energy-efficient LED lighting throughout

Materials Used

  • Premium laminate finishes
  • Acoustic ceiling panels
  • Anti-microbial flooring
  • Tempered glass partitions

Gallery

Reception & Lounge

A welcoming double-height reception with modern lounge seating, creating a sophisticated first impression for visitors and employees alike. Features custom lighting design and premium material finishes.

Theon Life Sciences reception area with modern lounge seating and double-height ceiling
Theon Life Sciences reception area with modern lounge seating and double-height ceiling
Contemporary lounge seating area at Theon Life Sciences office
Contemporary lounge seating area at Theon Life Sciences office
Ground floor view of Theon pharmaceutical office reception
Ground floor view of Theon pharmaceutical office reception

Boardroom

Premium boardroom designed for high-level meetings and client presentations, featuring integrated AV systems, acoustic treatments, and executive-grade furnishings.

Executive boardroom at Theon Life Sciences with AV integration
Executive boardroom at Theon Life Sciences with AV integration
Premium conference room interior with modern lighting
Premium conference room interior with modern lighting
Boardroom seating arrangement at Theon corporate office
Boardroom seating arrangement at Theon corporate office

Meeting Room

Focused meeting spaces designed for team collaboration and client discussions, featuring ergonomic seating and optimal acoustics.

Modern meeting room at Theon Life Sciences office
Modern meeting room at Theon Life Sciences office
Collaborative meeting space with natural lighting
Collaborative meeting space with natural lighting
Team meeting room interior design at Theon
Team meeting room interior design at Theon

Workstations

Open-plan workstation area designed for productivity and collaboration, featuring ergonomic furniture and optimal spacing for a pharmaceutical work environment.

Open-plan workstation area at Theon Life Sciences office
Open-plan workstation area at Theon Life Sciences office
Ergonomic workstations with modern design at Theon corporate
Ergonomic workstations with modern design at Theon corporate

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project